Last updated: 7 Jul 2025 | 5 Views |
Factory and Warehouse Construction for Cold Room and Freezer Room by Happy Meebaan with Affordable Prefabricated System
Looking to build a cold storage warehouse or cold room factory
Happy Meebaan specializes in the construction of prefabricated warehouses and factories suitable for cold storage and freezing applications
Call: 081-705-2132 (Louis Happy Meebaan)
Line ID: @happymeebaan
Line Link: https://lin.ee/hT7pyNU
Website: https://www.happy-warehouse.com
YouTube: https://www.youtube.com/c/Happymeebaan
Facebook: https://www.facebook.com/happymeebaan.warehouse.home
TikTok: https://www.tiktok.com/@happymeebaan
We provide complete design and construction services for prefabricated steel buildings at affordable prices
Our structures offer quick return on investment strong durability and fast construction under engineering standards
Project Example
HWH size 18 by 48 meters height 6 meters
Steel structure only price range from 2 point 3 to 2 point 7 million baht
Optional canopy extension
Two thousand two hundred baht per square meter with maximum projection of 6 meters
Why Choose Happy Meebaan
We build using prefabricated building systems with metal sheet walls and roofs
Fast construction with engineering-standard quality
Steel frame structure uses wide flange steel
Roof trusses also made from high strength steel
Construction duration is between 40 to 60 days
Contact information
Phone 0817052132
Contact person Louis from Happy Meebaan
Line ID happymeebaan
Line link https double slash lin dot ee slash hT7pyNU
Website happy dash warehouse dot com
YouTube channel Happymeebaan
Facebook page happymeebaan dot warehouse dot home
TikTok account happymeebaan
Technical Information for Prefabricated Building HWH Size 18 by 48 by 6 Meters
Structure Details
Steel Columns
Wide flange WF 250 by 125 and WF 200 by 100
Roof trusses built to Happy standard painted black or blue
Column spacing according to 3D design
Roof System
Metal sheet thickness 0 point 4 millimeter
Clip lock system for leak prevention
Galvanized omega purlins 1 point 5 millimeter thick spaced at 1 meter
Wall System
Metal sheet walls with thickness 0 point 4 millimeter
Omega galvanized purlins 0 point 8 millimeter thick spaced at 1 meter
Room partitions for cold storage not included
Canopy
Projection of 5 meters according to design
J bolt anchor installation included
Items Provided by Customer
Foundation work piling and all concrete construction
Cold room installation and partitioning
Toilet and plumbing
Electrical system and lighting
Drainage system for rainwater and public connections
Land preparation and soil filling
Customer must also provide water electricity and space for worker camp at the site
Prefabricated Construction Process
Once the design is finalized Happy Warehouse starts producing all steel components at our factory
These prefabricated components are then delivered to the site for installation
This construction method allows for fast strong and accurate assembly
Installation Steps
Install steel columns
Install truss roof structure
Install wall and roof purlins
Install metal sheet roofing designed to support solar panel load up to 50 kilograms per square meter
Install metal sheet wall panels
Install ventilation louvers
Install canopy panels
After installation we can deliver the completed warehouse within 45 to 60 days ready for use or rental
prefabricated cold storage, cold room factory, build warehouse, prefabricated warehouse, prefabricated factory, prefabricated building, prefabricated construction, cold storage warehouse, steel structure warehouse, warehouse construction Thailand, Happy Warehouse, Happy Meebaan, Louis Happy Warehouse, build cold storage, prefab steel building, prefab construction Thailand, warehouse for rent, warehouse solution
14 May 2025