Last updated: 15 Jan 2026 | 18 Views |
Free distribution of 3D warehouse and factory structural designs as a guideline for warehouse and factory design.
Structural materials manufacturing service for warehouses and factories (materials supply only, installation not included).
Free 3D warehouse design with a two-story office / warehouse layout.
Ideas and conceptual guidelines for warehouse and factory construction.
Happy Meebaan
Tel: +66 81-705-2132
Provided as a starting point for planning and positioning building columns before proceeding to detailed design work.
Free 3D Warehouse / Factory / Storage Design by Happy Meebaan
Structure size: 25 x 30 meters
Height: 8.5 meters
Price (structural materials only): 1.23 million THB
Installation not included
Contact Directly with Our Engineer for Accurate Cost Evaluation
Tel: +66 81-705-2132
LINE ID: @happymeebaan
LINE Link: https://lin.ee/hT7pyNU
Website: https://www.happy-warehouse.com/
YouTube: https://www.youtube.com/c/Happymeebaan
Facebook: https://www.facebook.com/happymeebaan.warehouse.home/
TikTok: https://www.tiktok.com/@happymeebaan
Important Conditions
The stated price covers materials only, excluding installation and warranty.
In case of minor scratches on the steel structure, 3 gallons of paint will be provided for customer touch-up.
Delivery to locations accessible by trailer trucks. Customers must prepare lifting equipment and manpower for unloading.
Does not include construction drawings, structural calculations for permit submission, or other overhead costs.
If not requested, no additional charges apply.
Supplied Materials
Steel structural system: Wide Flange columns and roof trusses
Size: 25 x 30 x 8.5 meters, gable roof, column head height 8 meters
J Bolts M16, 6 sets per column + 20 sets of screws and washers
Base plates + Wide Flange columns 300 x 150 mm, 20 columns
Base plates + Wide Flange roof trusses 350 x 175 mm, 6 frames
Roof bracing using steel box sections 4" x 4", thickness 2.0 mm, 3 lines
Screws, washers, and bolts for column-to-roof structure connections
Screws, washers, and bolts for roof truss connections
Turnbuckle set + DB16 reinforcing bars for roof cross bracing
Steel tie beams around the structure using steel box sections 4" x 4", thickness 2.0 mm
Payment Terms for Material Production
Payment 1: 50% deposit — production period 30–45 days
Payment 2: 40% before shipment from the factory
Payment 3: 10% upon completion of delivery, payable within 1 day










ติดต่อสายตรงมาที่ วิศวกร ประเมินราคาที่ชัดเจน
โทร 0817052132 Line : @happymeebaan
ลิงค์ไลน์ >> https://lin.ee/hT7pyNU
เวบไซท์>> https://www.happy-warehouse.com/
ยูทูป >> https://www.youtube.com/c/Happymeebaan
เฟสบุ้ค >> https://www.facebook.com/happymeebaan.warehouse.home/
ติ๊กต๊อก >> https://www.tiktok.com/@happymeebaan?_t=8ZyzGSDLBmE&_r=1
แบบโรงงาน #แบบโกดัง #แบบโรงงานฟรี #แบบโกดังฟรี
แบบโรงงาน,แบบโกดัง,แบบโรงงานฟรี,แบบโกดังฟรี,แจกแบบโกดัง,แจกแบบโรงงาน,หลุยแฮปปี้มีบ้าน,Louishappymeebaan,Louishappywarehouse