Last updated: 14 Aug 2025 | 24 Views |
Step-by-step guide on applying for tap water or groundwater for warehouse and factory construction. Includes cost estimates, water meter installation, and future-proof water system planning.
Call: 081-705-2132 (Louis Happy Meebaan)
Line ID: @happymeebaan
Line Link: https://lin.ee/hT7pyNU
Website: https://www.happy-warehouse.com
YouTube: https://www.youtube.com/c/Happymeebaan
Facebook: https://www.facebook.com/happymeebaan.warehouse.home
TikTok: https://www.tiktok.com/@happymeebaan
Check if a water pipeline is available in your area
If there is an existing water pipeline, you can request an additional water meter.
Cost of a secondary water meter: around 12,000 THB (based on waterworks authority rates).
Piping cost to the project site: 200–300 THB per meter.
For temporary use, you can connect PVC pipes directly to the meter.
If no water pipeline is available
Consider extending the water network (requires time and significant investment).
Consult with local waterworks officials for cost estimation.
While waiting, you may connect from neighboring water supply or
Drill a groundwater well (cost depends on depth and area).
Estimated Costs
Secondary water meter: 12,000 THB
Water piping to site: 200–300 THB per meter
Groundwater well drilling: 50,000–150,000 THB (depends on depth and soil condition)
Sufficient water supply during construction
Reduces risk of water shortages or low water pressure
Future-proof system reduces repeated costs
Precautions
Verify land ownership documents before drilling a well
Water network extension can be time-consuming
Choose durable pipes and fittings to minimize future repairs
apply tap water,groundwater request,warehouse construction,factory construction,water supply cost,water meter installation,warehouse water system,factory water system